A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | SPO/RRA | Sponsor/Party | Principal Investigator | Title | Department | Agreement # | Agreement Type | Project Start Date | Project End Date | Requested/Awarded | Funded | Project Status | ||||||||||||||
2 | 52078 | Amerada Hess Corporation | Mark Zoback | Collaborative Research on Optimizing Production from the Bakken Formation | Department of Geophysics | SPO 52078, PO 4500475211 | Contract | 2/15/2011 | 12/31/2013 | $169,924 | $ 169,924.00 | Awarded | Principal Investigator | Sponsor/Party | Title | Sum of Funded | ||||||||||
3 | 27032 | Apache Corporation | Jerry Harris | Geophysics Monitoring During Production of Coal Bed Methane in the Power River Basin | Department of Geophysics | 2703201 | Contract | 7/1/2002 | 8/31/2003 | $111,932 | $ 111,932.00 | Awarded | Hamdi Tchelepi | TOTAL E&P RECHERCHE DEVELOPPEMENT | Physics-Based Multiscale Framework for Modeling Fracturing and Oil and Gas Production from Source Rock | $ 6,532,667.00 | ||||||||||
4 | 108125 | Aramco Overseas Company | Jerry Harris | Microseismic and Geomechanical Characterizations of Shale Gas Reservoirs | Department of Geophysics | Work Order 005 Agmt No. 6500008571 | Contract | 1/1/2013 | 12/31/2015 | $637,790 | $ 637,790.00 | Awarded | Physics-Based Multiscale Framework for Modeling Fracturing and Oil and Gas Production from Source Rock--Preliminary Study | $ 539,538.00 | ||||||||||||
5 | 148736 | Aramco Services Company | Roland Horne | Machine Learning Approaches to Gauge Correlation for the Interference of Well Alerts | Department of Energy Resources Engineering | 6500004919 | Contract | 3/25/2019 | 12/31/2019 | $209,932 | $ 209,932.00 | Awarded | TOTAL E&P RECHERCHE DEVELOPPEMENT Total | $ 7,072,205.00 | ||||||||||||
6 | 107597 | Aramco Services Company | Anthony Kovscek | Collaborative Research on Development of Shale Gas Resources in the Kingdom of Saudi Arabia | Department of Energy Resources Engineering | 8 | Contract | 12/1/2014 | 12/31/2017 | $1,441,597 | $ 1,432,459.00 | Awarded | Aramco Services Company | Algebraic Nonlinear Equation Solvers Using Continuation Methods and Localization Strategies for GigaPOWERS | $ 1,260,000.00 | |||||||||||
7 | 117479 | Aramco Services Company | Roland Horne | Research Study - Enhanced Oil Recovery by Nanofluid Flooding | Department of Energy Resources Engineering | Z-0066-2011 | Contract | 10/1/2014 | 9/30/2017 | $390,000 | $ 390,000.00 | Awarded | Aramco Services Company Total | $ 1,260,000.00 | ||||||||||||
8 | 121623 | Aramco Services Company | Roland Horne | Data Mining and Machine Learning Approaches to Gauge Correlation for the Inference of Well Alerts | Department of Energy Resources Engineering | Work Order 011 / PO#6500001188 | Contract | 9/1/2015 | 8/31/2017 | $167,000 | $ 167,000.00 | Awarded | ConocoPhillips Company | Development of Upscaling Procedures for Fractured Porous Media Incorporating Stress Effect | $ 698,608.00 | |||||||||||
9 | 108691 | Aramco Services Company | Jonathan Payne | Comprehensive Evaluation and Modeling of Basin-Scale Controls on Carbonate Reservoir Architecture and on the Composition / Stratigraphy of Basin Centered ìShaleî Reservoirs | Department of Geological Sciences | 6500008571 Work Order #004 | Grant | 4/1/2013 | 3/31/2016 | $162,330 | $ 162,330.00 | Awarded | ConocoPhillips Company Total | $ 698,608.00 | ||||||||||||
10 | 25225 | Aramco Services Company | Hamdi Tchelepi | Algebraic Nonlinear Equation Solvers Using Continuation Methods and Localization Strategies for GigaPOWERS | Department of Energy Resources Engineering | 6500008571-WO-003.Rev.1 | Contract | 2/6/2001 | 12/31/2012 | $1,270,000 | $ 1,260,000.00 | Awarded | ExxonMobil | Parallel Reservoir Simulation Linear Solvers on Many-Core Architectures | $ 200,000.00 | |||||||||||
11 | 48767 | Aramco Services Company | Jerry Harris | The Development of Ensemble Kalman Filters for Applications to Seismic Inversion and Reservoir Monitoring | Department of Geophysics | 6500005730ENFKALGORITHM | Contract | 1/15/2010 | 6/15/2012 | $433,061 | $ 433,061.00 | Awarded | ExxonMobil Total | $ 200,000.00 | ||||||||||||
12 | 48119 | Aramco Services Company | Jerry Harris | 3-D Finite-Element Forward and Inverse Electromagnetic Modeling | Department of Geophysics | 6500008571 | Contract | 12/16/2009 | 6/1/2012 | $260,143 | $ 260,143.00 | Awarded | Hamdi Tchelepi Total | $ 9,230,813.00 | ||||||||||||
13 | 37670 | Aramco Services Company | Roland Horne | Work Order #12- Models for Capillary Pressure and Relative Permeability Prediction from Well Logs-Arab-D Carbonate Reservoir | Department of Energy Resources Engineering | 640071123/00REV2 | Contract | 6/15/2006 | 8/30/2007 | $100,000 | $ 100,000.00 | Awarded | Richard Luthy | Eni S.p.A. | Environmental Remediation: Sediment Management and Restoration | $ 3,378,510.00 | ||||||||||
14 | 35064 | Aramco Services Company | Roland Horne | Work Order #11 - Rig Scheduling | Department of Energy Resources Engineering | 6400711233/00REV1 | Contract | 9/1/2005 | 11/30/2006 | $150,000 | $ 150,000.00 | Awarded | Eni S.p.A. Total | $ 3,378,510.00 | ||||||||||||
15 | 32909 | Aramco Services Company | Louis Durlofsky | Work Order #010 - Adjoint Methods for Well Control Optimization | Department of Energy Resources Engineering | PO6510089387/6400711233WO#010 | Contract | 7/27/2004 | 7/31/2006 | $100,000 | $ 100,000.00 | Awarded | ChevronTexaco Corporation | Evaluation of Amendment for In-situ Management of Sediment | $ 103,000.00 | |||||||||||
16 | 32907 | Aramco Services Company | Roland Horne | Work Order No. 008 - Real-Time Data Analysis | Department of Energy Resources Engineering | PO#6510089422/ASC6400711233008 | Contract | 7/27/2004 | 7/31/2006 | $100,000 | $ 100,000.00 | Awarded | Evaluation of Amendment for In-situ Management of Sediment from a Chevron Site in Northern California | $ 271,280.00 | ||||||||||||
17 | 32908 | Aramco Services Company | Khalid Aziz | Work Order #009 Real-Time Calibration of Multiphase Flow Conditions | Department of Energy Resources Engineering | PO6510089423/6400711233WO#9 | Contract | 7/27/2004 | 7/31/2006 | $100,000 | $ 100,000.00 | Awarded | In-Situ Remediation of Petroleum Hydrocarbon Impacted Sediments: Advancing the State-of-the-Art. | $ 1,866,433.00 | ||||||||||||
18 | 718 | Aramco Services Company | Biondo Biondi | Reflection Seismology | Department of Geophysics | 6400709543/0012 | Contract | 9/1/1984 | 8/31/2005 | $580,000 | $ 580,000.00 | Awarded | ChevronTexaco Corporation Total | $ 2,240,713.00 | ||||||||||||
19 | 129516 | BHP Billiton Limited | Jef Caers | Computer Vision/Graphics-based Implicit Dynamic Earth Model for Automation of Data Fusion and Prediction in Mineral Resources Evaluation and Planning | Department of Geological Sciences | 129516 | Contract | 4/1/2017 | 6/30/2020 | $1,270,842 | $ 1,270,842.00 | Awarded | Chevron Environmental Management Company | Pilot-Scale Deployment of Activated Carbon at Castro Creek, Richmond, CA | $ 96,000.00 | |||||||||||
20 | 20859 | BP Amoco | John Bravman | Stanford Summer Engineering Academy | School of Engineering | [NONE] | Grant | 8/1/1999 | 7/31/2002 | $135,000 | $ 135,000.00 | Awarded | Chevron Environmental Management Company Total | $ 96,000.00 | ||||||||||||
21 | 125966 | BP Exploration, Inc. | Sally Benson | BP Agreement Reference: CCP4-SMV-008 (CW2127443) | Department of Energy Resources Engineering | 125966 | Contract | 11/28/2016 | 5/31/2018 | $125,000 | $ 125,000.00 | Awarded | Richard Luthy Total | $ 5,715,223.00 | ||||||||||||
22 | 49725 | BP Exploration, Inc. | Anthony Kovscek | Viscous and Heavy-Oil Solution Gas Drive | Department of Energy Resources Engineering | 49725/CW1901925 | Contract | 9/1/2011 | 12/31/2016 | $981,837 | $ 981,837.00 | Awarded | Anthony Kovscek | BP Exploration, Inc. | Physical, Chemical and Transport Processes as Related to Hydraulic Fracturing with CO2 in Shale Gas Reservoirs | $ 999,969.00 | ||||||||||
23 | 52260 | BP Exploration, Inc. | Anthony Kovscek | Physical, Chemical and Transport Processes as Related to Hydraulic Fracturing with CO2 in Shale Gas Reservoirs | Department of Energy Resources Engineering | 52260/CW1901927 | Contract | 7/1/2011 | 3/31/2015 | $999,969 | $ 999,969.00 | Awarded | Viscous and Heavy-Oil Solution Gas Drive | $ 981,837.00 | ||||||||||||
24 | 112263 | British Petroleum | Jef Caers | Building an Uncertainty Model From a Deterministic DFN Model | Department of Energy Resources Engineering | CW1983325 | Contract | 10/1/2013 | 9/30/2014 | $100,000 | $ 100,000.00 | Awarded | BP Exploration, Inc. Total | $ 1,981,806.00 | ||||||||||||
25 | 107601 | British Petroleum | Anthony Kovscek | Contingency Planning for Intervention in Unexpected Migration in CO2 Storage Projects: Phase 1 | Department of Energy Resources Engineering | 107601 | Contract | 4/1/2012 | 6/30/2014 | $692,173 | $ 692,173.00 | Awarded | Aramco Services Company | Collaborative Research on Development of Shale Gas Resources in the Kingdom of Saudi Arabia | $ 1,432,459.00 | |||||||||||
26 | 105696 | British Petroleum | Biondo Biondi | Wave-Propagation Engine Project | Department of Geophysics | CW1913860 Paykey: ZEPP11711D | Contract | 12/1/2011 | 11/30/2012 | $103,156 | $ 103,156.00 | Awarded | Aramco Services Company Total | $ 1,432,459.00 | ||||||||||||
27 | 26089 | British Petroleum | Howard Zebker | Monitoring the Injection and Storage of CO in Aquifers and Gas Reservoirs Using Satellite Radar Interterometry | Department of Geophysics | 4292 | Contract | 4/1/2002 | 12/31/2002 | $125,047 | $ 125,047.00 | Awarded | British Petroleum | Contingency Planning for Intervention in Unexpected Migration in CO2 Storage Projects: Phase 1 | $ 692,173.00 | |||||||||||
28 | 46796 | British Petroleum Exploration Operating Company Limited | Elizabeth Miller | Paleozoic-Mesozoic Depositional Environments and Paleogeography of the Circum-Arctic | Department of Geological Sciences | 46796 | Contract | 8/15/2009 | 8/14/2012 | $99,331 | $ 99,331.00 | Awarded | British Petroleum Total | $ 692,173.00 | ||||||||||||
29 | 135794 | Chevron Energy Technology Company | Anthony Kovscek | Reservoir Imaging, Characterization and simulation Center of Research Excellence (CoRE) | Department of Energy Resources Engineering | 135794 | Contract | 11/1/2017 | 12/31/2018 | $75,845 | $ 75,845.00 | Awarded | Occidental Petroleum Corporation | Characterization and Quantification of Oil Recovery Potential by Gas Injection into Fractured Low Permeability Reservoir Rock | $ 415,882.00 | |||||||||||
30 | 117154 | Chevron Energy Technology Company | Biondo Biondi | Implementation of SEP's Tomographic Full Waveform Inversion (TFWI) on Chevron Field Data as POC and Feasibility Analysis. | Department of Geophysics | CW1169940 | Contract | 10/1/2014 | 6/30/2016 | $29,424 | $ 29,424.00 | Awarded | Occidental Petroleum Corporation Total | $ 415,882.00 | ||||||||||||
31 | 117155 | Chevron Energy Technology Company | Biondo Biondi | Genesis Data: Integrating 4D Seismic and Production Data With Geomechanics | Department of Geophysics | CW1169940 | Contract | 10/1/2014 | 6/30/2016 | $45,011 | $ 45,011.00 | Awarded | Chevron Energy Technology Company | Diatomite Relative Permeability and Multiphase Flow Properties at Elevated Temperature | $ 264,988.00 | |||||||||||
32 | 111082 | Chevron Energy Technology Company | Anthony Kovscek | Diatomite Relative Permeability and Multiphase Flow Properties at Elevated Temperature | Department of Energy Resources Engineering | CW926066/K26118 | Contract | 3/1/2013 | 7/31/2015 | $179,995 | $ 179,995.00 | Awarded | Reservoir Imaging, Characterization and simulation Center of Research Excellence (CoRE) | $ 75,845.00 | ||||||||||||
33 | 105889 | Chevron Energy Technology Company | Anthony Kovscek | Diatomite Relative Permeability and Multiphase Flow Properties at Elevated Temperature | Department of Energy Resources Engineering | CW926066 - K26118 | Contract | 12/1/2011 | 11/30/2012 | $84,993 | $ 84,993.00 | Awarded | Chevron Energy Technology Company Total | $ 340,833.00 | ||||||||||||
34 | 105423 | Chevron Environmental Management Company | Richard Luthy | Pilot-Scale Deployment of Activated Carbon at Castro Creek, Richmond, CA | Civil and Environmental Engineering | C957860 | Contract | 9/1/2011 | 7/31/2012 | $96,000 | $ 96,000.00 | Awarded | TOTAL E&P RECHERCHE DEVELOPPEMENT | Design and Preliminary Tests of an Experiment to Visualize in Real Time Source Rock Evolution Undergoing Mechanical and Thermal Stress | $ 301,178.00 | |||||||||||
35 | 14080 | Chevron Oil Field Research Company | Donald Lowe | Predictive Modeling of the Geometry and Physical Properties of High-Density Sediment-Gravity Flow Deposits | Department of Geological Sciences | 4505181 | Contract | 7/1/1994 | 6/30/2001 | $654,831 | $ 654,831.00 | Awarded | TOTAL E&P RECHERCHE DEVELOPPEMENT Total | $ 301,178.00 | ||||||||||||
36 | 47786 | ChevronTexaco Corporation | Richard Luthy | In-Situ Remediation of Petroleum Hydrocarbon Impacted Sediments: Advancing the State-of-the-Art. | Civil and Environmental Engineering | 47786 | Contract | 7/1/2010 | 12/31/2017 | $1,866,433 | $ 1,866,433.00 | Awarded | Anthony Kovscek Total | $ 5,164,331.00 | ||||||||||||
37 | 49469 | ChevronTexaco Corporation | Richard Luthy | Evaluation of Amendment for In-situ Management of Sediment | Civil and Environmental Engineering | K23630/CW77598/SO15022036 | Contract | 9/1/2009 | 5/31/2012 | $103,000 | $ 103,000.00 | Awarded | Eric Kool | Eni S.p.A. | Large-Scale Development of Flourescent Sensors and Arrays Using a DNA Scaffold | $ 2,395,546.00 | ||||||||||
38 | 45705 | ChevronTexaco Corporation | Richard Luthy | Evaluation of Amendment for In-situ Management of Sediment from a Chevron Site in Northern California | Civil and Environmental Engineering | [NONE] | Contract | 6/1/2009 | 9/30/2010 | $271,280 | $ 271,280.00 | Awarded | Eni S.p.A. Total | $ 2,395,546.00 | ||||||||||||
39 | 36707 | ChevronTexaco Corporation | Nicholas Melosh | Stanford Chevron Program for Diamondoid Nanoscience | T.H. Geballe Laboratory for Advanced Materials | AMENDMENTNO.2 | Contract | 5/1/2006 | 4/30/2010 | $1,500,000 | $ 1,500,000.00 | Awarded | Eric Kool Total | $ 2,395,546.00 | ||||||||||||
40 | 33146 | ChevronTexaco Corporation | Robert Feigelson | Science and Technology of Diamondoids | T.H. Geballe Laboratory for Advanced Materials | 33146 | Contract | 12/7/2004 | 12/6/2005 | $75,000 | $ 75,000.00 | Awarded | Jef Caers | BHP Billiton Limited | Computer Vision/Graphics-based Implicit Dynamic Earth Model for Automation of Data Fusion and Prediction in Mineral Resources Evaluation and Planning | $ 1,270,842.00 | ||||||||||
41 | 49501 | ConocoPhillips Company | Hamdi Tchelepi | Development of Upscaling Procedures for Fractured Porous Media Incorporating Stress Effect | Department of Energy Resources Engineering | 1182-SRA-GRE-2014 | Contract | 1/1/2011 | 12/31/2014 | $698,608 | $ 698,608.00 | Awarded | BHP Billiton Limited Total | $ 1,270,842.00 | ||||||||||||
42 | 116584 | Devon Energy Corporation | Mark Zoback | Collaborative Project Between Devon and Stanford University | Department of Geophysics | IC2014-0858 | Contract | 7/1/2014 | 6/30/2015 | $102,898 | $ 102,898.00 | Awarded | Eni S.p.A. | A Methodology for Developing a 3D Training-image Database | $ 250,000.00 | |||||||||||
43 | 21006 | ECOPETROL | Biondo Biondi | Stanford Exploration Project to do Fundamental Research in Reflection Seismology | Department of Geophysics | 210066 | Contract | 9/1/1998 | 8/31/2004 | $228,000 | $ 228,000.00 | Awarded | DEEPPROFIT: a strategy for rapid & realistic forecasting of reservoir performance using process-based models | $ 150,000.00 | ||||||||||||
44 | 121212 | Eni S.p.A. | Jef Caers | DEEPPROFIT: a strategy for rapid & realistic forecasting of reservoir performance using process-based models | Department of Geological Sciences | 4310173395 - 5210000752 | Contract | 1/1/2016 | 12/31/2016 | $150,000 | $ 150,000.00 | Awarded | PROcess Based Models for Reservoir Fast Integration Technologies | $ 300,000.00 | ||||||||||||
45 | 52406 | Eni S.p.A. | Richard Luthy | Environmental Remediation: Sediment Management and Restoration | Civil and Environmental Engineering | 4310051576_2500004072 | Contract | 2/1/2011 | 6/30/2016 | $3,378,510 | $ 3,378,510.00 | Awarded | Eni S.p.A. Total | $ 700,000.00 | ||||||||||||
46 | 115697 | Eni S.p.A. | Gerald Mavko | Pore Pressure Prediction Ahead of the Drill Bit | Department of Geophysics | 4310131876-2500004072 | Contract | 1/26/2015 | 12/31/2015 | $150,000 | $ 150,000.00 | Awarded | British Petroleum | Building an Uncertainty Model From a Deterministic DFN Model | $ 100,000.00 | |||||||||||
47 | 116162 | Eni S.p.A. | Sally Benson | Proposal for Measuring Stress-Dependent Fluid Flow Behavior in Fractures and Its Application in CO2-EOR | Department of Energy Resources Engineering | 2500004072 | Contract | 4/1/2014 | 12/31/2015 | $100,762 | $ 100,762.00 | Awarded | British Petroleum Total | $ 100,000.00 | ||||||||||||
48 | 108689 | Eni S.p.A. | Khalid Aziz | Development of Shale Gas Simulation Capabilities in GPRS | Department of Energy Resources Engineering | 4310030184 - 2500004072 | Contract | 9/1/2012 | 8/31/2015 | $297,503 | $ 297,503.00 | Awarded | Repsol Services Company US | Risk-return appraisal of the Duvernay shale by Bayesian data analytics | $ 60,000.00 | |||||||||||
49 | 107892 | Eni S.p.A. | Tiziana Vanorio | Shale Rock Properties for Sweet Spot Identification: Measuring, Imaging, and Computing | Department of Geophysics | 4310042500-2500004072 | Contract | 4/1/2013 | 3/31/2015 | $991,550 | $ 991,550.00 | Awarded | Repsol Services Company US Total | $ 60,000.00 | ||||||||||||
50 | 52575 | Eni S.p.A. | Eric Kool | Large-Scale Development of Flourescent Sensors and Arrays Using a DNA Scaffold | Chemistry | 2500004072 | Contract | 2/1/2011 | 2/28/2015 | $2,395,546 | $ 2,395,546.00 | Awarded | Jef Caers Total | $ 2,130,842.00 | ||||||||||||
51 | 105807 | Eni S.p.A. | Louis Durlofsky | Contingency Planning and Remediation Methods for Mitigating Potential Environmental Impacts from Geological Storage of CO2 and CO2-EOR | Department of Energy Resources Engineering | 2500004072 / 105807 | Contract | 1/1/2012 | 12/31/2014 | $291,072 | $ 291,072.00 | Awarded | Jerry Harris | Aramco Services Company | 3-D Finite-Element Forward and Inverse Electromagnetic Modeling | $ 260,143.00 | ||||||||||
52 | 107430 | Eni S.p.A. | Jef Caers | PROcess Based Models for Reservoir Fast Integration Technologies | Department of Energy Resources Engineering | 2500004072-4310027052 | Contract | 4/1/2012 | 9/30/2014 | $300,000 | $ 300,000.00 | Awarded | The Development of Ensemble Kalman Filters for Applications to Seismic Inversion and Reservoir Monitoring | $ 433,061.00 | ||||||||||||
53 | 52416 | Eni S.p.A. | Alfred Spormann | Bioremediation and Environmental Microbiology | Civil and Environmental Engineering | 2500004072 | Contract | 2/1/2011 | 4/30/2014 | $775,000 | $ 775,000.00 | Awarded | Aramco Services Company Total | $ 693,204.00 | ||||||||||||
54 | 109646 | Eni S.p.A. | Peter Kitanidis | Hydraulic Tomography and Optimal Management of Plumes | Civil and Environmental Engineering | 4310049886 - 2500004072 | Contract | 3/1/2013 | 2/28/2014 | $374,062 | $ 374,062.00 | Awarded | Aramco Overseas Company | Microseismic and Geomechanical Characterizations of Shale Gas Reservoirs | $ 637,790.00 | |||||||||||
55 | 104234 | Eni S.p.A. | Stephan Graham | Tracking gas migration through core/cutting analysis | Department of Geological Sciences | 2500004072/4300138496 | Contract | 9/1/2011 | 12/31/2013 | $430,778 | $ 430,778.00 | Awarded | Aramco Overseas Company Total | $ 637,790.00 | ||||||||||||
56 | 108695 | Eni S.p.A. | Louis Durlofsky | Discrete Fracture Modelling for KArstified and Fractured Reservoir Simulation (Kafres) - Task 1 | Department of Energy Resources Engineering | 2500004072 - 4310028397 | Contract | 9/1/2012 | 8/31/2013 | $53,421 | $ 53,421.00 | Awarded | ExxonMobil | MEANS Crosswell Data Processing | $ 298,788.00 | |||||||||||
57 | 100820 | Eni S.p.A. | Stephan Graham | Search for new plays in mature basins | Department of Geological Sciences | 4300134837-2500004072 | Contract | 6/20/2011 | 12/19/2012 | $365,082 | $ 365,082.00 | Awarded | Mechanisms of Vertical Hydrocarbon Leakage | $ 10,000.00 | ||||||||||||
58 | 43793 | Eni S.p.A. | Louis Durlofsky | Optimal Well Location and Planning in Reservoir Models | Department of Energy Resources Engineering | 4700007699ST1 | Contract | 1/1/2009 | 12/31/2011 | $238,914 | $ 238,914.00 | Awarded | ExxonMobil Total | $ 308,788.00 | ||||||||||||
59 | 41081 | Eni S.p.A. | Jef Caers | A Methodology for Developing a 3D Training-image Database | Department of Energy Resources Engineering | 4700007704ST1 | Contract | 10/1/2007 | 6/30/2010 | $250,000 | $ 250,000.00 | Awarded | Apache Corporation | Geophysics Monitoring During Production of Coal Bed Methane in the Power River Basin | $ 111,932.00 | |||||||||||
60 | 127951 | Equinor Energy ASA, Norway | Erik Sperling | Source Rock distribution across a depositional system: 3D examples of areal (map view) and vertical (time) variability from OAE-related strata. | Department of Geological Sciences | 127951 | Contract | 9/1/2017 | 6/30/2020 | $191,824 | $ 191,824.00 | Awarded | Apache Corporation Total | $ 111,932.00 | ||||||||||||
61 | 154332 | Equinor US Operations LLC | Nicholas Melosh | Using Diamondoids for Emerging Technologies | T.H. Geballe Laboratory for Advanced Materials | SPO154332 | Contract | 9/17/2019 | 9/16/2020 | $75,000 | $ 75,000.00 | Awarded | Jerry Harris Total | $ 1,751,714.00 | ||||||||||||
62 | 155886 | ExxonMobil | Mykel Kochenderfer | Sequential Development of Correlated Resources | Aeronautics and Astronautics | LAW-2019-3499 (EM11163.TO9) | Contract | 10/1/2019 | 12/31/2020 | $208,599 | $ 208,599.00 | Awarded | Ronald Hanson | Shell Global Solutions Inc. | Combustion Chemistry of Ground Transportation II | $ 900,000.00 | ||||||||||
63 | 139567 | ExxonMobil | Martin Fejer | Investigation of optimization using a Coherent Ising Machine | Edward L. Ginzton Laboratory | EM11163.TO5 | Contract | 12/1/2018 | 12/31/2020 | $122,564 | $ 111,422.00 | Awarded | Shell Global Solutions Inc. Total | $ 900,000.00 | ||||||||||||
64 | 135222 | ExxonMobil | Matteo Cargnello | Nature-inspired materials for conversion of methane to methanol | Chemical Engineering | EM11163.TO1 | Contract | 3/1/2018 | 8/31/2020 | $340,000 | $ 340,000.00 | Awarded | Total (Compagnie Francaise Des Petroles) | An Investigation of Lubricant Additives and Gasoline Ignition Kinetics Using Shock Tubes | $ 150,000.00 | |||||||||||
65 | 139487 | ExxonMobil | Mykel Kochenderfer | Data-Driven Modeling and Control of Complex Systems | Aeronautics and Astronautics | EM11163.T04 | Contract | 12/1/2018 | 12/31/2019 | $138,089 | $ 131,513.00 | Awarded | Cool Flame NTC Chemistry: Shock Tube/Laser Absorption Research | $ 390,000.00 | ||||||||||||
66 | 106226 | ExxonMobil | Gerald Mavko | Piceane Basin Study | Department of Geophysics | EM03565.2 | Contract | 12/16/2011 | 12/24/2019 | $260,594 | $ 260,594.00 | Awarded | Total (Compagnie Francaise Des Petroles) Total | $ 540,000.00 | ||||||||||||
67 | 138191 | ExxonMobil | Richard Zare | Most Efficient Use of Oil Reserves | Chemistry | EM11163.TO2 | Contract | 7/1/2018 | 11/30/2019 | $123,809 | $ 123,809.00 | Awarded | ExxonMobil | Field Demonstration of TDL Measurement of Temperature Fluctuation Near LBO | $ 257,092.00 | |||||||||||
68 | 105887 | ExxonMobil | Mark Zoback | ExxonMobil Cold Lake Project | Department of Geophysics | EM03565.1 | Contract | 12/1/2011 | 12/24/2017 | $260,594 | $ 260,594.00 | Awarded | ExxonMobil Total | $ 257,092.00 | ||||||||||||
69 | 108126 | ExxonMobil | Jerry Harris | MEANS Crosswell Data Processing | Department of Geophysics | EM03565.5 | Contract | 10/9/2012 | 9/30/2016 | $298,788 | $ 298,788.00 | Awarded | Ronald Hanson Total | $ 1,697,092.00 | ||||||||||||
70 | 116164 | ExxonMobil | Eric Shaqfeh | Simulation of the Effect of Microstructural Surface Features on Fouling in Hydrocarbon Flow Through Complex Geometries | Chemical Engineering | EM0985 | Contract | 12/1/2014 | 11/30/2015 | $127,464 | $ 127,464.00 | Awarded | Nicholas Melosh | ChevronTexaco Corporation | Stanford Chevron Program for Diamondoid Nanoscience | $ 1,500,000.00 | ||||||||||
71 | 51469 | ExxonMobil | Louis Durlofsky | Development of New Procedures for Modeling Liquid-Gas Flow in Complex Wells | Department of Energy Resources Engineering | EM03565.3 | Contract | 12/14/2011 | 3/26/2014 | $255,665 | $ 255,665.00 | Awarded | ChevronTexaco Corporation Total | $ 1,500,000.00 | ||||||||||||
72 | 106091 | ExxonMobil | Hamdi Tchelepi | Parallel Reservoir Simulation Linear Solvers on Many-Core Architectures | Department of Energy Resources Engineering | EM03565.4 | Contract | 12/9/2011 | 12/8/2013 | $200,000 | $ 200,000.00 | Awarded | Equinor US Operations LLC | Using Diamondoids for Emerging Technologies | $ 75,000.00 | |||||||||||
73 | 40701 | ExxonMobil | Ronald Hanson | Field Demonstration of TDL Measurement of Temperature Fluctuation Near LBO | Mechanical Engineering | 40701002 | Contract | 9/1/2007 | 2/28/2009 | $257,092 | $ 257,092.00 | Awarded | Equinor US Operations LLC Total | $ 75,000.00 | ||||||||||||
74 | 35884 | ExxonMobil | Elizabeth Miller | Testing Plate Tectonic Models for the Amerasian Basin: Sandstone Provenance Studies and Basin Peleogeography Acrss the Russian Arctic | Department of Geological Sciences | E2006ETC018 | Contract | 1/1/2006 | 12/31/2007 | $60,686 | $ 60,686.00 | Awarded | Nicholas Melosh Total | $ 1,575,000.00 | ||||||||||||
75 | 30573 | ExxonMobil | Elizabeth Miller | Paleogeography and Basin Development in the Circum-Arctic Region: Single-Grain U-Pb Dating of Detrial Zircon Populations from Triassic Sandstones from NE Russia and Westernmost Alaska | Department of Geophysics | E2004ETC025 | Contract | 1/31/2004 | 12/31/2004 | $29,773 | $ 29,773.00 | Awarded | Roland Horne | Aramco Services Company | Data Mining and Machine Learning Approaches to Gauge Correlation for the Inference of Well Alerts | $ 167,000.00 | ||||||||||
76 | 28840 | ExxonMobil | Jerry Harris | Mechanisms of Vertical Hydrocarbon Leakage | Department of Geophysics | [NONE] | Contract | 4/21/2003 | 5/2/2003 | $10,000 | $ 10,000.00 | Awarded | Machine Learning Approaches to Gauge Correlation for the Interference of Well Alerts | $ 209,932.00 | ||||||||||||
77 | 28354 | ExxonMobil | Biondo Biondi | Methods for 3D Seismic Imaging | Department of Geophysics | P2002ETC047 | Contract | 4/1/2002 | 4/15/2002 | $10,000 | $ 10,000.00 | Awarded | Research Study - Enhanced Oil Recovery by Nanofluid Flooding | $ 390,000.00 | ||||||||||||
78 | 21643 | ExxonMobil | Elizabeth Miller | Structure and Thermochronology of the Verkhoyansk Fold-and-Thrust Belt: Implications for the Tectonic Evolution of the Sea Okhotsk Margin of Eastern Russia | Department of Geological Sciences | P99918038928 | Contract | 6/1/1999 | 12/31/2001 | $119,684 | $ 119,684.00 | Awarded | Work Order #11 - Rig Scheduling | $ 150,000.00 | ||||||||||||
79 | 8192 | ExxonMobil Foundation | James Sweeney | Energy, Natural Resources & the Environment Program | Economics | SPO#8192 | Grant | 9/1/1989 | 12/31/2004 | $1,116,850 | $ 1,116,850.00 | Awarded | Work Order #12- Models for Capillary Pressure and Relative Permeability Prediction from Well Logs-Arab-D Carbonate Reservoir | $ 100,000.00 | ||||||||||||
80 | 124023 | Gulfport Energy Corporation | Mark Zoback | Utica Shale Project - Gulfport | Department of Geophysics | 124023 | Contract | 3/1/2016 | 6/30/2018 | $207,280 | $ 207,280.00 | Awarded | Work Order No. 008 - Real-Time Data Analysis | $ 100,000.00 | ||||||||||||
81 | 21588 | Occidental Oil and Gas Corporation | Atilla Aydin | The Structural Evolution and Hydrocarbon Potential of the Albania Fold and Thrust Belt | Department of Geological Sciences | AMD5 | Contract | 4/19/1999 | 8/31/2000 | $122,816 | $ 122,816.00 | Awarded | Aramco Services Company Total | $ 1,116,932.00 | ||||||||||||
82 | 36139 | Occidental Petroleum Corporation | Anthony Kovscek | Characterization and Quantification of Oil Recovery Potential by Gas Injection into Fractured Low Permeability Reservoir Rock | Department of Energy Resources Engineering | B060341106AMD01 | Contract | 2/15/2006 | 7/31/2009 | $415,882 | $ 415,882.00 | Awarded | Roland Horne Total | $ 1,116,932.00 | ||||||||||||
83 | 25582 | Oil and Natural Gas Corporation, Ltd. | Gerald Mavko | Rock Physics Characterization of Bombay High Reservoir: Main Study | Department of Geophysics | NCX | Contract | 10/1/2002 | 5/31/2005 | $162,938 | $ 162,938.00 | Awarded | James Sweeney | ExxonMobil Foundation | Energy, Natural Resources & the Environment Program | $ 1,116,850.00 | ||||||||||
84 | 140279 | Repsol Services Company US | Jef Caers | Risk-return appraisal of the Duvernay shale by Bayesian data analytics | Department of Geological Sciences | SPO 140279 | Contract | 10/1/2018 | 8/31/2019 | $60,000 | $ 60,000.00 | Awarded | ExxonMobil Foundation Total | $ 1,116,850.00 | ||||||||||||
85 | 130392 | Seven Generations Energy Ltd. | Adam Brandt | Seven Generations Collaboration with Stanford University, University of British Columbia, University of Calgary | Department of Energy Resources Engineering | 130392 | Contract | 5/1/2017 | 9/30/2018 | $175,977 | $ 175,977.00 | Awarded | James Sweeney Total | $ 1,116,850.00 | ||||||||||||
86 | 123839 | Shell Company Foundation | Hai Wang | Combustion Chemistry of Ground Transportation Fuels | Mechanical Engineering | PT63585 | Contract | 8/1/2016 | 6/30/2017 | $300,000 | $ 300,000.00 | Awarded | Biondo Biondi | Aramco Services Company | Reflection Seismology | $ 580,000.00 | ||||||||||
87 | 134253 | Shell Global Solutions Inc. | Ronald Hanson | Combustion Chemistry of Ground Transportation II | Mechanical Engineering | CW114091 | Contract | 1/1/2018 | 12/31/2020 | $900,000 | $ 900,000.00 | Awarded | Aramco Services Company Total | $ 580,000.00 | ||||||||||||
88 | 124250 | Shell Global Solutions Inc. | Gerald Fuller | Investigation of Base Oil/Water Emulsion Stability | Chemical Engineering | PT60980 | Contract | 3/15/2016 | 1/30/2020 | $327,061 | $ 327,061.00 | Awarded | ECOPETROL | Stanford Exploration Project to do Fundamental Research in Reflection Seismology | $ 228,000.00 | |||||||||||
89 | 131786 | Shell Global Solutions Inc. | Eric Shaqfeh | Modelling Film Drainage of Lubricants as a Predictor of Foam Stability | Chemical Engineering | PT75885 | Contract | 7/17/2017 | 2/1/2018 | $50,000 | $ 50,000.00 | Awarded | ECOPETROL Total | $ 228,000.00 | ||||||||||||
90 | 156512 | Shell International Exploration and Production, Inc. | Greg Beroza | Ambient noise adjoint tomography using differential sensitivity kernels | Department of Geophysics | N/A | Contract | 7/1/2019 | 6/30/2020 | $139,886 | $ 139,886.00 | Awarded | Total E&P Research and Technology USA, LLC | Interpreting geological feature from sub-optimally focused seismic images using Deep Learning methods | $ 115,701.00 | |||||||||||
91 | 123606 | Shell International Exploration and Production, Inc. | Greg Beroza | Ground motion and seismicity studies at Groningen Gas Field | Department of Geophysics | PT61489 | Contract | 4/1/2016 | 3/31/2019 | $792,438 | $ 792,438.00 | Awarded | Total E&P Research and Technology USA, LLC Total | $ 115,701.00 | ||||||||||||
92 | 104679 | Shell International Exploration and Production, Inc. | Jonathan Payne | Comprehensive Evaluation and Modeling of Basin-Scale Controls on Carbonate Reservoir Architecture and on the Composition/Stratigraphy of Basin Centered ìShaleî Reservoirs | Department of Geological Sciences | PT31819 | Contract | 4/1/2013 | 3/31/2016 | $163,526 | $ 163,526.00 | Awarded | British Petroleum | Wave-Propagation Engine Project | $ 103,156.00 | |||||||||||
93 | 38229 | Shell International Exploration and Production, Inc. | Elizabeth Miller | Thermal History and Temporal Constraints on the Age of Fold- Thrust Systems in Northeast Arctic Russia | Department of Geological Sciences | 382292 | Contract | 6/19/2006 | 1/31/2010 | $65,089 | $ 65,089.00 | Awarded | British Petroleum Total | $ 103,156.00 | ||||||||||||
94 | 113538 | Statoil Research Centre | William Mitch | H&ETQPAmine 5: Nitramine Analysis Procedure Development and Screening Toxicity Study | Civil and Environmental Engineering | Statoil 4600014746 | Contract | 7/1/2013 | 10/15/2013 | $23,419 | $ 23,419.00 | Awarded | Chevron Energy Technology Company | Genesis Data: Integrating 4D Seismic and Production Data With Geomechanics | $ 45,011.00 | |||||||||||
95 | 123916 | Total (Compagnie Francaise Des Petroles) | Ronald Hanson | Cool Flame NTC Chemistry: Shock Tube/Laser Absorption Research | Mechanical Engineering | U16-005 | Contract | 3/1/2016 | 2/28/2018 | $390,000 | $ 390,000.00 | Awarded | Implementation of SEP's Tomographic Full Waveform Inversion (TFWI) on Chevron Field Data as POC and Feasibility Analysis. | $ 29,424.00 | ||||||||||||
96 | 116306 | Total (Compagnie Francaise Des Petroles) | Ronald Hanson | An Investigation of Lubricant Additives and Gasoline Ignition Kinetics Using Shock Tubes | Mechanical Engineering | PC14-049 / U14-019 PO 4505722531 | Contract | 12/1/2014 | 11/30/2015 | $150,000 | $ 150,000.00 | Awarded | Chevron Energy Technology Company Total | $ 74,435.00 | ||||||||||||
97 | 117624 | TOTAL E&P RECHERCHE DEVELOPPEMENT | Hamdi Tchelepi | Physics-Based Multiscale Framework for Modeling Fracturing and Oil and Gas Production from Source Rock | Department of Energy Resources Engineering | FR00009800 | Contract | 1/1/2015 | 12/31/2019 | $7,466,000 | $ 6,532,667.00 | Awarded | ExxonMobil | Methods for 3D Seismic Imaging | $ 10,000.00 | |||||||||||
98 | 116082 | TOTAL E&P RECHERCHE DEVELOPPEMENT | Anthony Kovscek | Design and Preliminary Tests of an Experiment to Visualize in Real Time Source Rock Evolution Undergoing Mechanical and Thermal Stress | Department of Energy Resources Engineering | FR00007375 | Contract | 6/1/2014 | 1/31/2016 | $301,178 | $ 301,178.00 | Awarded | ExxonMobil Total | $ 10,000.00 | ||||||||||||
99 | 116092 | TOTAL E&P RECHERCHE DEVELOPPEMENT | Hamdi Tchelepi | Physics-Based Multiscale Framework for Modeling Fracturing and Oil and Gas Production from Source Rock--Preliminary Study | Department of Energy Resources Engineering | FR00007379 | Contract | 6/1/2014 | 12/31/2015 | $539,538 | $ 539,538.00 | Awarded | Biondo Biondi Total | $ 1,111,292.00 | ||||||||||||
100 | 112729 | TOTAL E&P RECHERCHE DEVELOPPEMENT | Mark Zoback | Collaborative Project Between Total and Stanford University to better understand how the Barnett shale responds to slick-water fracturing with the goal of improving the efficiency of stimulation operations. | Department of Geophysics | FR00006877 | Contract | 12/19/2013 | 12/31/2015 | $97,493 | $ 97,493.00 | Awarded | Tiziana Vanorio | Eni S.p.A. | Shale Rock Properties for Sweet Spot Identification: Measuring, Imaging, and Computing | $ 991,550.00 |